VITJO MEDIA

When the schedule and the cost report agree

Construction & Infrastructure

Project controls, site systems and progress intelligence for contractors and developers — because the schedule and the cost report should agree.

Site admin time saved
63%
Variation capture rate
3,1×
Payment cycle reduction
27 days

Our position

Why we build for construction

Construction runs on information that is always slightly out of date. By the time a variation reaches the cost report, the decision that caused it is weeks old. We build systems that shorten that loop: capture at the point of work, progress measured from what is actually built, and a single view of cost, programme and risk.

Regulations we design against

  • Construction Regulations 2014 (OHS Act)
  • Occupational Health and Safety Act 85 of 1993
  • CIDB standards for uniformity in construction procurement
  • National Building Regulations and Building Standards Act 103 of 1977
  • JBCC and FIDIC contractual record-keeping requirements
  • Protection of Personal Information Act 4 of 2013 (POPIA)

Challenges

What people in this sector actually raise

These are the problems that come up in a first meeting, with the cost of leaving each one unaddressed.

  • 01

    Paper-based site records

    Site diaries, inspections and variations captured on paper and entered days later, if at all.

    Weak contractual position when claims are disputed
  • 02

    Cost and programme divergence

    The schedule and the cost report maintained separately and reconciled monthly.

    Overruns discovered a month after they became unavoidable
  • 03

    Subcontractor coordination

    Progress, compliance and payment tracked over email and WhatsApp with no system of record.

    Disputes, delays and payment friction
  • 04

    Health and safety compliance

    Inductions, permits and toolbox talks recorded on paper across multiple site entrances.

    Compliance exposure and unverifiable records
  • 05

    Progress measurement

    Percentage complete estimated subjectively and optimistically.

    Payment applications and forecasts built on unreliable input

What we build

Systems for construction operations

  • Mobile site capture

    Diaries, inspections, snags and variations captured offline at the point of work with photographs and GPS.

  • Integrated project controls

    Cost, programme and earned value in one model with a single source of progress.

  • Subcontractor portal

    Progress claims, compliance documents and payment status in a shared system of record.

  • Digital induction and permits

    Site access controlled by verified induction and valid permit, checked at the gate.

  • Drone and photogrammetry progress

    Objective progress measurement from regular aerial capture compared against the model.

  • Document and drawing control

    Version-controlled drawings with issue tracking and confirmed receipt.

AI opportunities

Where AI genuinely pays in this sector

Ranked by how proven the approach is. We are explicit about what is experimental, because deploying an experiment as though it were proven is how AI programmes lose credibility.

  • Progress estimation from imagery

    emerging

    Automated percentage-complete measurement from site photography and drone capture.

    Typical returnObjective valuations and fewer payment disputes
  • PPE and safety compliance detection

    proven

    Vision monitoring of PPE compliance and exclusion zones at active work fronts.

    Typical return40–60% reduction in observed violations
  • Variation and claim classification

    emerging

    Automatic extraction and categorisation of variation instructions from correspondence.

    Typical returnStronger contemporaneous records for claims
  • Schedule risk simulation

    proven

    Monte Carlo simulation over the programme using actual historical productivity.

    Typical returnEarlier warning of completion risk

Questions

Construction — common questions

The questions we are asked most often by operators in this sector.

  • Will it work on a site with no network coverage?
    Yes. Site capture is fully offline and syncs when a device reaches coverage, which on most projects is the site office or the gate.
  • Can subcontractors use it without licences?
    Yes. Subcontractor access is included in the project, so there is no per-seat barrier to the people whose data you actually need.
  • Do you integrate with CCS Candy or BuildSmart?
    Yes, where an integration path exists. Otherwise we provide structured exports aligned to your cost-code structure.
  • How is drone data handled?
    Captured on a regular cycle, processed into a point cloud and compared against the model or previous capture to produce objective progress by area.

Working in construction?

Tell us what you are trying to change. We will tell you honestly whether we can help and what it would take.

WhatsApp+27 81 586 8991